0220 Frame Fabrication Center
Fabrication Center processes two jambs or 1 head & 1 sill per cycle. Extrusions are manually loaded onto the Autoloader which can accumulate up to eight 21.5’ maximum length extrusions. Equipped with two tooling pockets, extrusions in P1 and P2 are moved in the X axis with servo positioned grippers for fabrication. After parts are fully processed and cutoff from the extrusion they are pushed clear of the Fabrication Center onto an accumulation table, then pushed forward for operator to apply printed labels.
View Product